“Science in the Public Service” – Forum on Application of Technology in Construction and Operation of Lung Shan Tunnel

26/09/2020

The North Development Office participated a forum at "Science in the Public Service 2020" and introduced the application of technology in the construction of Lung Shan Tunnel including the largest dual-mode Earth Pressure Balanced Tunnel Boring Machine (TBM) in Hong Kong, TBM U-turn inside cavern, semi-automatic drilling robot and Traffic Control and Surveillance Systems, etc.

The North Development Office participated a forum at “Science in the Public Service 2020” and introduced the application of technology in the construction of Lung Shan Tunnel including the largest dual-mode Earth Pressure Balanced Tunnel Boring Machine (TBM) in Hong Kong, TBM U-turn inside cavern, semi-automatic drilling robot and Traffic Control and Surveillance Systems, etc.
The North Development Office participated a forum at “Science in the Public Service 2020” and introduced the application of technology in the construction of Lung Shan Tunnel including the largest dual-mode Earth Pressure Balanced Tunnel Boring Machine (TBM) in Hong Kong, TBM U-turn inside cavern, semi-automatic drilling robot and Traffic Control and Surveillance Systems, etc.
PrevNext
Back