Infrastructure works for developments at Kwun Tong Action Area

Project Number:

7842CL

Brief Description of Project Scope:

The scope of the project comprises:-

(a)  construction of new access roads L1 of about 120 metres (m) long and L2 of about 70 m long, and associated road modification and junction improvement works;

(b)  construction of an about 50 m long covered footbridge with associated lifts and staircases across Wai Yip Street to connect Hoi Yuen Road and KTAA;

(c)  modification of an existing public transport interchange;

(d)  reconfiguration of Kwun Tong Vehicular Ferry Pier (KTVFP) and the associated dangerous goods vehicular (DGV) queuing area;

(e)  provision of the adjoining waterfront promenade and open space;

(f)  carrying out associated demolition and site formation, drainage, sewerage, waterworks, landscaping, electrical and street lighting works, utilities and other ancillary works; and

(g)  implementation of environmental mitigation measures for the proposed works.

Project Office in Civil Engineering and Development Department:

East Development Office (Enquiry: 3842 7149)

Consultant:

Atkins China Limited

Other Related Information:

Gazette Date Subject
4 June 2021 & 11 June 2021

Scheme

Back