Stage 3A - infrastructure comprises the construction of the following major items:
- new roads about 890 metres (m) in total length covering L1, Road L11 and a slip road linking Prince Edward Road East (PERE) to Road D1;
- a vehicular underpass about 225m long across PERE forming part of Road L1;
- a new pedestrian subway of about 205m long, and extension of an existing subway about 60m in total length, across PERE;
- modification and widening of existing roads in former Kai Tak Airport north apron area and San Po Kong area;
- associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping works and electrical and mechanical works; and
- provision of necessary environmental mitigation measures and implementation of an environmental monitoring and audit programme associated with the above works.
Stage 4 - infrastructure comprises the construction of the following major items:
- construction of about 1 630m long of new roads covering part of Road D2, Road L6 and Road L19;
- reconstruction and widening of sections of existing footpaths at Sung Wong Toi Road and To Kwa Wan Road;
- construction of two sewage pumping stations, about 2 000m long of twin rising mains and 2 300m long of gravity sewer;
- construction of stormwater drains including about 3 600m long of road drains and 430m long of box culverts;
- associated footpaths, street lighting, traffic aids, water mains and landscaping works; and
- provision of necessary environmental mitigation measures and implementation of an environmental monitoring and audit programme for the works associated with the above works.