Hung Shui Kiu/Ha Tsuen New Development Area - Second Phase Development
Project Number:
7787CL, 7829CL, 7845CL and 7846CLBrief Description of Project Scope:
The detailed design of site formation and infrastructure works under Hung Shui Kiu / Ha Tsuen New Development Area (HSK/HT NDA) Second Phase Development (i.e. Advance Works Phases 3 and Stage 2 Works and related studies) commenced in 2020 and 2021 respectively. The corresponding works commenced progressively from the first half of 2024.
1. Advance Works Phase 3 mainly covers –
(a) site clearance and formation (including land decontamination works) of about 51 ha of land together with the provision of associated engineering infrastructure, to ready these formed land for subsequent development of public and private housing, community facilities, commercial and industrial premises and other uses, and for construction of the proposed infrastructure works in paragraph (b) below;
(b) engineering infrastructure works including a primary distributor road, district distributor roads, local roads, sewerage (including pumping stations), drainage, water supply, landscaping, electrical and mechanical ("E&M") and associated works; and
(c) environmental mitigation measures and the EM&A programme for the works in paragraphs (a) and (b) above.
2. Stage 2 Works and related studies mainly cover –
(a) site clearance and formation (including land decontamination works) of about 200 ha of land, together with the provision of associated engineering infrastructure, to ready these formed land for subsequent development of public and private housing, community facilities, commercial and industrial premises, the Green Transit Corridor (comprising the Environmentally Friendly Transport Services, footpaths and cycle tracks) and other uses, and for construction of the proposed infrastructure works in paragraph (b) below;
(b) engineering infrastructure works including district distributor roads, local roads, revitalisation of existing channels, sewerage (including pumping stations), drainage (including pumping stations), water supply, landscaping, E&M and associated works;
(c) environmental mitigation measures and the EM&A programme for the works in paragraphs (a) and (b) above; and
(d) related studies covering the following areas –
(i) reviewing the overall public and private housing mix with a view to increasing the share of public housing in view of the latest policy direction;
(ii) reviewing infrastructure provisions to support the revised housing mix and examining the possibility of reprovisioning Tin Ying Road around its current location;
(iii) assessing the feasibility of green and smart initiatives including common utility tunnels for the entire New Development Area development; and
(iv) conducting an urban and green design study for the area around the riverside promenade along the revitalised Tin Shui Wai River Channel in the north-eastern extent of Hung Shui Kiu/Ha Tsuen (HSK/HT) New Development Area (NDA).
Project Office in Civil Engineering and Development Department:
West Development Office (Enquiry: 2158 5680)Consultant:
Agreement No. CE 1/2020 (CE) - Hung Shui Kiu/Ha Tsuen New Development Area Package A Works for Second Phase Development - Design and Construction- Ove Arup & Partners Hong Kong Limited
Agreement No. CE 71/2020 (CE) - Hung Shui Kiu/Ha Tsuen New Development Area Package B Works for Second Phase Development - Design and Construction
- Ove Arup & Partners Hong Kong Limited
Approved Project Estimate:
Advance Works Phase 3: $5,674.8 million (7787CL)Stage 2 Works: $20,272.0 million (7829CL)
Related Website:
https://www.hskhtnda.hk/en/Current Progress:
Works commenced progressively from June 2024.
Contract:
Contract No. YL/2023/01 - Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development - Contract 1 - Site Formation and Engineering Infrastructure WorksScope: |
(a) site clearance and formation (including land decontamination works) for about 30 hectares of lands, together with provision of associated engineering infrastructure; (b) construction of local roads connecting to Ping Ha Road, Shek Po Road and Shek Po East Road; (c) construction of a community liaison centre; (d) construction of associated works including water mains, drainage and sewerage works, district cooling mains, cycle tracks, footpaths, box culvert, landscaping works, electrical and mechanical works and other ancillary works; and (e) implementation of environmental mitigation measures (including noise barriers) and environmental monitoring works for the works mentioned above. |
Commencement Date: | 6 June 2024 |
Completion Date: | 2028 |
Contract Sum: | $560 million |
Contractor: | Sang Hing – Kuly Joint Venture |
Contract No. YL/2023/02 - Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development - Contract 2 - Fresh Water Service Reservoir and Associated Mainlaying Works
Scope: |
(a) site clearance and formation for about 8.5 hectares of lands; (b) construction of Tan Kwai Tsuen East Fresh Water Service Reservoir and associated roadworks, power supply and landscaping works; (c) laying of about 4.5 km long fresh water mains and about 3.5 km long flushing water mains; and (d) implementation of environmental mitigation measures and related environmental monitoring and audit programme for the works mentioned above. |
Commencement Date: | 7 June 2024 |
Completion Date: | 2029 |
Contract Sum: | $1,997 million |
Contractor: | Chun Wo – Build King – Yee Hop Joint Venture |
Contract No. YL/2023/03 - Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development- Contract 3 - Site Formation and Engineering Infrastructure Works
Scope: | (a) site clearance and formation (including land decontamination works) for about 50 hectares of lands, together with provision of associated engineering infrastructure; (b) construction of district distributor and local roads connecting Hung Shui Kiu/Ha Tsuen New Development Area to Tin Ha Road and Castle Peak Road; (c) construction of a pedestrian footbridge and associated stairs and lifts; (d) construction of a vehicular underpass and associated depressed roads; (e) realignment and revitalisation of some sections of Tin Sam Channel; (f) construction of a sewage pumping station; (g) construction of a common utility enclosure; (h) reprovision of a sitting-out area near Tung Lei Path; (i) modification of existing MTR Light Rail Transit junctions at Castle Peak Road; (j) modification of MTR Tuen Ma Line Emergency Access Point 26 in Tuen Mun; (k) construction of associated works including water mains, drainage and sewerage works, district cooling mains, cycle tracks, footpaths, box culverts, landscaping works, electrical and mechanical works and other ancillary works; and (l) implementation of environmental mitigation measures (including noise barriers) and environmental monitoring works for the works mentioned above. |
Commencement Date: | 18 October 2024 |
Completion Date: | 2032 |
Contract Sum: | $3,363 million |
Contractor: | Gammon – Richwell Engineering Joint Venture |
Contract No. YL/2023/04 - Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development- Contract 4 - Site Formation and Engineering Infrastructure Works
Scope: |
(a) site clearance and formation (including land decontamination works) for about 43 hectares of lands, together with provision of associated engineering infrastructure; |
Commencement Date: | 27 September 2024 |
Completion Date: | 2030 |
Contract Sum: | $1,710 million |
Contractor: |
Build King –Tung Lee Joint Venture |