Integrated Basement for West Kowloon Cultural District - first and second stages of design, site investigation and construction works

Project Number:

7791CL
Attachment 1Attachment 2

Brief Description of Project Scope:

The first and second stages of works comprises - 

(a) first stage of design and advance works of the integrated basement, covering the following major items –

(i) construction of the foundations for both an underground road and the protection works for the existing Airport Express tunnels (AET) in Zone 3A of the integrated basement, necessary environmental mitigation measures, and related monitoring and auditing works; and

(ii) design of essential basement structure and associated works for Zone 3B of the integrated basement including preparation of tender documents and assessment of tenders for the construction works.

(b) second stage of design, site investigation and construction works of the integrated basement, covering the following major items –

(i) construction of an underground road of about 140 metres long in Zone 3A of the integrated basement, associated ancillary works including footpaths, pick-up/drop-off area, electrical and mechanical works, plant rooms, means of escape/means of access for firefighting and rescue, and essential enabling works for the remaining section of the underground road in Zone 3A of the integrated basement;

(ii) protection works for the existing AET in Zone 3A;

(iii) construction of the foundations for Zone 3B of the integrated basement including those for the protection works for the existing AET;

(iv) design and site investigation of essential basement structure and associated works for Zone 2A of the integrated basement, including preparation of tender documents and assessment of tenders for the construction works;

(v) preliminary design and site investigation of essential basement structures and associated works for Zones 2B and 2C of the integrated basement; and

(vi) necessary environmental mitigation measures, and related monitoring and auditing works for construction and site investigation works in sub-paragraphs (i) to (v) above.

Cost:

$2,919.5 million

Completion Date:

December 2019

Project Office in Civil Engineering and Development Department:

South Development Office (Enquiry: 3842 7062)

Other Related Information:

Gazettal Documents

Scheme / Amendments of Scheme / Authorization of Scheme
Gazette Date Subject
30 APR 2015 &
8 MAY 2015

Authorization of Scheme

13 FEB 2015 &
18 FEB 2015

Scheme