The Government has introduced charging for the disposal of construction waste at landfills, sorting facilities and public fill reception facilities through the following amendments to the Waste Disposal Ordinance (Cap. 354).
- The Waste Disposal Ordinance defines construction waste
- Details of the charging scheme are set out in the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap. 354N)
- The powers to implement the charging scheme in Government-owned facilities are provided in the Waste Disposal (Designated Waste Disposal Facility) Regulation (Cap. 354L)
- Account Application
- Application Form for Vessel Disposal
The following departments are responsible for the planning and management of the Designated Waste Disposal Facilities :
Designated Waste Disposal Facilities | Responsible Department |
---|---|
Public Fill Reception Facilities | Civil Engineering and Development Department |
Construction Waste Sorting Facilities | Civil Engineering and Development Department |
Landfills | Environmental Protection Department |
- Locations of Designated Waste Disposal Facilities
- Timetable of Services of Designated Waste Disposal Facilities Managed by CEDD
- Samples of Waste to be Rejected Immediately from Public Fill Reception Facilities (1805KB)
- Samples of Sludge, Marine Mud and Pond Mud to be Rejected Immediately from Public Fill Reception Facilities (933KB)
- Samples of Improper Carrying of Liquid Materials (446KB)
- Transaction Records of Construction Waste Disposal at Designated Waste Disposal Facilities
- Briefing on Overloading Control Measures for Dump Trucks (662KB)
- Notice of Fine-tuned Part A of Enhanced Control Measures against Dump Truck Overloading (267KB)
- Tips for Using Public Fill Reception Facility Safely (408KB)
- Safety Tips for Dump Truck Drivers (Jul 2017) (Chinese version only) (1596KB)
Demonstration video for using Public Fill Reception Facility Safely (Chinese version only): Watch Video
Demonstration video for proper carrying of wet soil (Chinese version only): Watch Video
For implementation details of the Construction Waste Disposal Charging Scheme, Click Here to access the relevant webpage of Environmental Protection Department