Report No. : GEO Publication No. 1/2009
Report Title : Prescriptive Measures for Man-made Slopes and Retaining Walls (2009), 74p.
Author : Geotechnical Engineering Office
Abstract
This Publication presents a recommended standard of good practice for the application of prescriptive measures as improvement works on existing man-made slopes and retaining walls in Hong Kong. The scope of application covers a range of prescriptive measures items in the form of preventive maintenance works, upgrading works or repair works to landslides. Various types of prescriptive measures have been developed for soil/rock cut slopes, fill slopes and masonry/concrete retaining walls.
Download Document(s)
No. | Item |
---|---|
1 | Prescriptive Measures for Man-made Slopes and Retaining Walls (1.83MB) |