The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
July to September 2015
Reference number | Information requested and released |
---|---|
13-01 | Preliminary Environmental Review and tree survey report of a development project |
14-02 | Seawall and structure as-built drawings of a site |
15-03 | Seawall as-built drawings of a lot |
16-04 | Seawall as-built drawings of a site |
17-05 | Reclamation / formation works Record Plan of a site |
18-06 | Information on seabed dredging works |
20-07 | Information on maintenance of sewer of a residential development |
21-08 | Information on a landscape contract |
22-09 | Information on construction and demolition materials |
23-10 | Ground investigation data of a site |
24-11 | Gazette Plan of a mine site |
October to December 2015
Reference number | Information requested and released |
---|---|
19-12 | Information on district improvement works |
25-13 | Information on Greening Master Plan of districts |
26-14 | Foreshore and seabed information of a lot |
27-15 | Ground investigation data of sites |
28-16 | Specifications of civil engineering works |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2016
Reference number | Information requested and released |
---|---|
1-17 | Information on maintenance of drainage installations |
2-18 | Information on slope works sites |
2-19 | Information on slope works sites |
2-20 | Information on slope works sites |
3-21 | Information on site formation and infrastructure works |
4-22 | As-built drawing of a pier |
April to June 2016
Reference number | Information requested and released |
---|---|
2-24 | Information on slope works sites |
2-25 | Information on slope works sites |
9-26 | Gazette Plan of works |
10-27 | Gazette Plan of works |
July to September 2016
Reference number | Information requested and released |
---|---|
11-28 | Information on construction waste |
13-29 | Landslip prevention and mitigation works for slope |
15-30 | Gazette Plan of works |
16-31 | Information on columbarium development |
October to December 2016
Reference number | Information requested and released |
---|---|
18-32 | Archaeological Investigation report |
21-33 | Sea Wall drawings |
22-34 | Report on territorial development strategy |
23-35 | As-built drawings of piers |
25-36 | As-built drawings of piers |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2017
Reference number | Information requested and released |
---|---|
1-37 | Information on transport infrastructure |
1-38 | Information on transport infrastructure |
1-39 | Information on transport infrastructure |
4-40 | Information on land development |
8-41 | As-built drawing of a pier |
9-42 | As-built drawing of a pier |
11-43 | As-built drawing of a pier |
14-44 | Information on reclamation works |
14-45 | Information on reclamation works |
17-46 | As-built drawing of a pier |
April to June 2017
Reference number | Information requested and released |
---|---|
3-47 | Information on development planning and engineering study |
7-48 | Information on development planning and engineering study |
16-49 | Information on development planning and engineering study |
18-50 | Information on seawalls and waterfront |
21-51 | Information on land development |
26-52 | Information on road infrastructure and land development |
27-53 | Information on road infrastructure and land development |
28-54 | Gazette Plan of works |
29-55 | Information on laboratory tests |
30-56 | Information on design of wetland and tree survey |
July to September 2017
Reference number | Information requested and released |
---|---|
32-57 | Information on slope safety |
34-58 | Information on road infrastructure |
October to December 2017
Reference number | Information requested and released |
---|---|
44-59 | As-built drawing of seawalls |
45-60 | Information on transport infrastructure |
46-61 | Information on site formation and infrastructural works |
47-62 | Information on slope |
47-63 | Information on slope |
48-64 | Information on works contracts |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2018
Reference number | Information requested and released |
---|---|
49-65 | Design memorandum of projects |
50-66 | Information on transport study |
1-67 | Information on land development |
2-68 | Information on beach sand |
5-69 | Information on reclamation work and piers |
5a-70 | Information on piers |
6-71 | As-built drawing of a pier |
8-72 | Information on a quarry |
10-73 | Information on laboratory tests |
11-74 | Information on land development |
April to June 2018
Reference number | Information requested and released |
---|---|
16-75 | Information on recruitment |
17-76 | Information on Universal Accessibility projects |
5b-77 | Information on reclamation work and piers |
5c-78 | Information on reclamation work and piers |
5d-79 | Information on reclamation work and piers |
5e-80 | Information on reclamation work and piers |
18-81 | Information on recruitment |
19-82 | Information on recruitment |
21-83 | Information on landslide inventory |
July to September 2018
Reference number | Information requested and released |
---|---|
22-84 | Information on employment of civil servant |
23-85 | Information on recruitment |
25-86 | Information on recruitment |
26-87 | Information on a cycle track |
27-88 | Information on reclamation work |
29-89 | Information on qualification of Engineer |
30-90 | Information on recruitment |
31-91 | Information on as-built drawings of piers and seawalls |
32-92 | Information on recruitment |
33-93 | Information on recruitment |
34-94 | Information on reclamation works |
35-95 | Information on Traffic and Transport Impact Assessment |
36-96 | Information on recruitment |
38-97 | Information on as-built drawings of a pier |
39-98 | Information on gazette drawings |
41-99 | Information on as-built data of sea walls |
October to December 2018
Reference number | Information requested and released |
---|---|
40-100 | Information of Guideline on Application for Registration of Bar Pattern of Confirmed Origin |
42-101 |
Information on establishment and vacancies |
43-102 | Information on beach erosion |
44-103 | Information on Annual reports of CEDD |
45-104 | Information on as-built drawings of a seawall and wave wall |
46-105 | Information on reclamation works |
48-106 | Information on geology |
49-107 | Information on as-built drawings of a pier |
51-108 | Information on conservation work |
52-109 | Information on reclamation works |
51a-110 | Information on conservation work |
54-111 | Information on use of underground space |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2019
Reference number | Information requested and released |
---|---|
51b-112 | Information on conservation work |
53-113 | Information on transport and housing development |
51c-114 | Information on conservation work |
53a-115 | Information on transport and housing development |
55-116 | Information on conservation work |
3-117 | Information on reclamation works |
51d-118 | Information on conservation work |
1-119 | Information on consultancies awarded |
2-120 | Information on conservation work |
4-121 | Information on Traffic and Transport Impact Assessment |
5-122 | Information on Traffic Impact Assessment |
3a-123 | Information on reclamation works |
6-124 | Information on ground investigation reports |
3b-125 | Information on reclamation works |
8-126 | Information on a drawing of works |
12-127 | Information on recruitment |
April to June 2019
Reference number | Information requested and released |
---|---|
10-128 | Information on conservation work |
11-129 | Information on an investigation study report |
14-130 | Information on land contamination and decontamination |
16-131 | Information on construction and demolition materials |
12a-132 | Information on recruitment |
44-133 | Information on Traffic and Transport Impact Assessment |
20-134 | Information on recruitment |
21-135 | Information on a consultant report |
22-136 | Information on government vehicles |
23-137 | Information on a construction work |
16a-138 | Information on construction and demolition materials |
24-139 | Information on blasting works |
26-140 | Information on works contracts |
27-141 | Information on a construction work |
28-142 | Information on seawalls |
30-143 | Information on conservation work |
31-144 | Information on gazette drawings |
30a-145 | Information on staff profile |
33-146 | Information on reclamation work |
38-147 | Information on improvement works |
16b-148 | Information on construction and demolition materials |
38a-149 | Information on the report of an improvement works |
July to September 2019
Reference number | Information requested and released |
---|---|
24a-150 | Information on blasting works |
40-151 | Information on recruitment |
41-152 |
Information on tender |
41a-153 | Information on tender |
42-154 | Information on wave measurement |
24b-155 | Information on blasting works |
30b-156 | Information on conservation work |
43-157 | Information on slope |
48-158 | Information on recruitment |
49-159 | Information on recruitment |
51-160 | Information on construction waste disposal at fill bank |
October to December 2019
Reference number | Information requested and released |
---|---|
54-161 | Information on urban greening |
55-162 | Information on reclamation works |
56-163 |
Information on construction waste disposal at fill bank |
57-164 | Information on a construction work |
57a-165 | Information on a construction work |
58-166 | Information on drawings of tunnels |
59-167 | Information on slope |
61-168 | Information on ground settlement |
63-169 | Information on conservation work |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2020
Reference number | Information requested and released |
---|---|
1-170 | Information on conservation work |
2-171 | Information on the supplier list |
3-172 | Information on translation service |
4-173 | Information on departmental hotlines |
5-174 | Information on Landslip prevention and mitigation programme |
6-175 | Information on relocation of bus-bus interchange |
7-176 | Information on Landslip prevention and mitigation programme |
1a-177 | Information on conservation work |
6a-178 | Information on relocation of bus-bus interchange |
April to June 2020
Reference number | Information requested and released |
---|---|
10-179 | Information on a construction work |
12-180 | Information on as-built drawings |
13-181 | Information on the loading of a structure |
16-182 | Information on recruitment |
17-183 | Information on plans of road works |
18-184 | Information on a feasibility study |
19-185 | Information on slope greening and tree management |
20-186 | Information on slopes |
21-187 |
Information on works project management |
22-188 |
Information on the design theme and tree planting of a park |
23-189 |
Information on relocation of bus-bus interchange and the improvement works of a road juncture |
24-190 |
Information on a road project |
26-191 |
Information on recruitment |
27-192 |
Information on works for slopes and retaining walls |
28-193 |
Information on the structural plan of a pier |
29-194 |
Information on as-built drawings |
22a-195 |
Information on tree planting of a park |
July to September 2020
Reference number | Information requested and released |
---|---|
31-196 |
Information on slope remediation plans |
32-197 | Information on landslip prevention works |
33-198 | Information on a facelift project |
35-199 | Information on a seawall structure |
36-200 | Information on recruitment |
38-201 | Information on recruitment |
41-202 | Information on recruitment |
43-203 | Information on a tunnel |
43a-204 |
Information on a tunnel |
43b-205 |
Information on a tunnel |
45-206 |
Information on conservation work |
45a-207 |
Information on conservation work |
46-208 |
Information on water quality data |
47-209 |
Information on drainage plans |
49-210 |
Information on landslide inventory |
50-211 |
Information on a pier |
October to December 2020
Reference number | Information requested and released |
---|---|
51-212 | Information on recruitment |
52-213 | Information on structural plan of a pier |
54-214 | Information on a project of a new town |
57-215 | Information on recruitment |
59-216 | Information on conservation work |
60-217 | Information on reconstruction and improvement work |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2021
Reference number | Information requested and released |
---|---|
58-218 | Information on feasibility study of a project |
61-219 | Information on the road works of a project |
1-220 | Information on a pier and seawall |
2-221 | Information on internship programme |
61a-222 | Information on the road works of a project |
3-223 | Information on traffic and transport impact assessment of projects |
4-224 | Information on reclamation works |
5-225 | Information on decontamination works |
6-226 | Information on geographic data of a site |
7-227 | Information on landslides data |
8-228 | Information on drainage impact assessment of a project |
9-229 | Information on construction waste |
10-230 | Information on feasibility study of infrastructure works |
11-231 | Information on piers |
13-232 | Information on traffic impact assessment of a project |
14-233 | Information on geotechnical data of a site |
April to June 2021
Reference number | Information requested and released |
---|---|
15-234 | Information on traffic and transport impact assessment of a project |
16-235 | Information on site formation and infrastructure works |
17-236 | Information on decontamination works |
18-237 | Information on a pedestrian connectivity facility |
19-238 | Information on dredging and reclamation works |
20-239 | Information on consultancy agreements |
9a-240 | Information on construction waste |
21-241 | Information on geotechnical information infrastructure |
22-242 | Information on Greening Master Plans |
23-243 | Information on recruitment and promotion |
24-244 | Information on a consultancy agreement |
25-245 | Information on as-built drawings of a pier |
26-246 | Information on servicing and maintenance contracts |
27-247 | Information on decontamination works |
28-248 | Information on improvement works for hiking facilities |
28a-249 | Information on improvement works for hiking facilities |
29-250 | Information on studies of reclamation works |
32-251 | Information on as-built drawings of a pier |
33-252 | Information on recruitment |
July to September 2021
Reference number | Information requested and released |
---|---|
30-253 |
Information on studies of reclamation works |
34-254 | Information on reclamation works |
35-255 |
Information on a beach |
36-256 | Information on recruitment |
31a-257 | Information on a beach |
37-258 | Information on works at a trail |
38-259 | Information on an outline zoning plan |
39-260 | Information on investigation study |
40-261 | Information on works of a slope |
41-262 | Information on Civil Engineering Works Index |
42-263 | Information on usage of a site |
43-264 | Information on studies of reclamation works |
44-265 | Information on an investigation study |
45-266 | Information on recruitment |
46-267 |
Information on a development project |
48-268 | Information on a feasibility study |
49-269 |
Information on qualification of Geotechnical Field Technician |
50-270 | Information on studies of reclamation works |
October to December 2021
Reference number | Information requested and released |
---|---|
52-271 | Information on a seawall |
53-272 | Information on a slope |
54-273 |
Information on development of a new town |
55-274 |
Information on a development project |
56-275 |
Information on recruitment |
57b-276 |
Information on a feasibility study |
59-277 |
Information on traffic and transport impacts brought by a development project |
60-278 | Information on landslides and preventive maintenance |
61-279 |
Information on recruitment |
63-280 |
Information on a planning and engineering study |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2022
Reference number | Information requested and released |
---|---|
62-281 | Information on flyovers and stub ends |
1-282 | Information on site investigation work of a project |
3-283 | Information on site investigation work of a project |
4-284 | Information on site formation and infrastructural works of a project |
7-285 | Information on a road |
8-286 | Information on a feasibility studies of sites |
April to June 2022
Reference number | Information requested and released |
---|---|
11-287 |
Information on recruitment |
13-288 |
Information on the structures of a site |
14-289 | Information on road works of a project |
17-290 | Information on building works |
18-291 |
Information on a study of coastal hazards |
18a-292 | Information on a study of coastal hazards |
21-293 | Information on a works site |
24-294 | Information on studies of pier improvement works |
July to September 2022
Reference number | Information requested and released |
---|---|
24a-295 |
Information on studies of pier improvement works |
25-296 |
Information on a land development project |
27-297 | Information on recruitment |
28-298 | Information on studies of pier improvement works |
30-299 |
Information on climate change |
31-300 | Information on seawalls |
32-301 | Information on a housing development project |
October to December 2022
Reference number | Information requested and released |
---|---|
33-302 | Information on environmental protection works |
35-303 | Information on recruitment |
36-304 | Information on recruitment |
37-305 | Information on sea level |
38-306 |
Information on waste loads |
43-307 |
Information on a pier |
44-308 |
Information on modification works of a development project |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information ("the Code") by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2023
Reference number | Information requested and released |
---|---|
41-309 | Information on recruitment |
45-310 | Information on a retaining wall |
46-311 | Information on as built drawings of a seawall |
1-312 | Information on slopes |
2-313 | Information on road works |
3-314 | Information on an incinerator |
4-315 | Information on a new road |
7-316 |
Information on air raid shelters |
7a-317 | Information on air raid shelters |
9-318 |
Information on a development project |
10-319 | Information on slopes |
12-320 |
Information on as built drawings of a river |
13-321 | Information on a slope |
April to June 2023
Reference number | Information requested and released |
---|---|
14-322 |
Information on recruitment |
15-323 |
Information on paper consumption |
16-324 |
Information on recruitment |
17-325 |
Information on recruitment |
18-326 |
Information on landscape of an infrastructure |
20-327 |
Information on a feasibility study |
21-328 |
Information on a device installed at a bus station |
22-329 |
Information on complaint handling mechanism |
23-330 |
Information on a pier |
26-331 |
Information on a development project |
28-332 |
Information on as built drawings of a site |
July to September 2023
Reference number | Information requested and released |
---|---|
27-333 |
Information on reclamation |
29-334 |
Information on rocks |
30-335 |
Information on a retaining wall |
32-336 |
Information on wave measurement |
33-337 |
Information on a road work |
34-338 |
Information on complaints handling |
36-339 |
Information on feasibility of a development project |
October to December 2023
Reference number | Information requested and released |
---|---|
35-340 | Information on a land development project |
37-341 |
Information on complaints handling |
38-342 |
Information on a feasibility study |
40-343 |
Information on reclamation work |
41-344 |
Information on a tunnel work |
42-345 |
Information on an ecology study |
44-346 |
Information on ground investigation |
46-347 |
Information on a geotechnical publication |
46a-348 |
Information on a geotechnical publication |
47-349 |
Information on as-built drawings of a structure |
48-350 |
Information on a geotechnical report |
49-351 |
Information on ground investigation works |
50-352 |
Information on improvement works |
52-353 |
Information on a road work |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.